Licensed & Insured·CBC1269311·Serving Tampa Bay
Dreamway Construction logo
REQUEST AN ESTIMATE
Remodeled kitchen with white cabinetry and quartz counters

Kitchen Remodeling Planned Around How the Room Gets Used

Cabinetry, counters, appliances and the services behind them, coordinated in one scope so the pieces arrive in the right order and fit when they get here.

Licensed & Insured·CBC1269311·Serving Tampa Bay
Licensed & Insured
Florida GC · CBC1269311
Over a Decade of Experience
Building in Tampa Bay since 2015
Detailed Project Planning
Written scopes, allowances, schedule
Quality Workmanship
Backed by a written warranty
CERTIFIED
INSTALLER
Schluter
SYSTEMS
WE WORK
WITH
GoBoard
JOHNS MANVILLE
LATICRETE
MATERIALS
KBRS
SHOWER SYSTEMS

SCOPE OF WORK

What a Dreamway Kitchen Includes

Every line below appears in your written proposal with an allowance attached, so you know exactly what is and is not in the number.

Demolition and protection

Floors and adjoining rooms papered and sealed, appliances pulled and stored, and every load hauled off rather than parked in the driveway.

Cabinetry set and scribed

Boxes shimmed level across the run, scribed to out-of-plumb walls, and doors adjusted after the counters land, not before.

Counters and backsplash

Templated after cabinets are set, seams placed where they read least, and the backsplash laid out so the cuts do not land at eye level.

Appliance and plumbing rough-ins

Water, gas, drain and duct positions set from the actual spec sheets of the appliances you chose, not from generic rough-in drawings.

Electrical load and lighting

Circuits sized for induction, double ovens and a dedicated microwave, with under-cabinet and task lighting switched where you would reach for it.

Inspections and closeout

Rough electrical and plumbing inspections coordinated by us, punch list closed, written warranty issued.

HOW WE BUILD IT CORRECTLY

The Kitchen Is Mostly What You Cannot See

Cabinet doors are the last two percent of a kitchen. The parts that decide whether it still works in ten years are the framing behind the boxes, the circuits feeding the appliances and the duct carrying the range hood outside.

01
Measure the room, not the plan

Walls are rarely square and floors are rarely flat. We measure the actual room before the cabinet order goes in, because a quarter inch of error is a filler strip you look at every day.

02
Services set from the real spec sheets

Rough-in positions come from the appliances you actually selected. Changing the range after the gas line is run is a wall repair, so selections get locked before rough-in.

03
Ventilation ducted outside

A hood that recirculates into the room is not ventilation. We size the duct to the hood and run it out through the wall or roof with a proper cap.

04
Cabinets level across the whole run

Set to a laser line, not to the floor. Counters only sit flat if the boxes underneath them are in one plane.

05
Counters templated after cabinets

Digital template once the boxes are fixed and the sink is on site. Templating from drawings is how you get a gap along the back wall.

Completed kitchen cabinetry run with integrated appliances
FINISHED KITCHEN

CERTIFIED INSTALLER

Schluter

WE WORK WITH

GoBoardLATICRETEKBRS

Systems installed to manufacturer specification, which is what keeps their material warranty intact.

OPTIONAL UPGRADES

Worth Deciding Before the Cabinet Order Goes In

Every one of these is cheap while the walls are open and expensive afterwards. We price them as separate line items so you can choose with real numbers.

Kitchen island with seating and pendant lighting
Induction-ready circuit
Dedicated 240V run now, whether or not the range is induction yet.
Ducted range hood
Sized to the cooktop and vented outside, not recirculated.
Drawer banks over doors
Deep drawers reach the back. Base cabinets with doors do not.
Under-cabinet lighting
Switched separately, wired before the backsplash goes on.
Pot filler
Supply and shutoff run while the wall is open.
Counter-depth pantry
Full-height cabinetry instead of a shallow closet.
Waterfall island end
Continuous grain at the mitre, which needs slab planning.
Undermount lighting sensor
Motion switching on the toe kick for night use.

ABOUT PRICING

Every kitchen is different. Pricing depends on the size of the run, whether the layout moves, cabinet construction, counter material, appliance selections and what we find behind the old cabinets. After reviewing the space and scope, we provide a detailed proposal.

No fixed-price packages. No numbers quoted before we have seen the space.

YOUR KITCHEN PROJECT

A Clear Process From First Call to Closeout

Five clear stages, so you always know what is happening on your project and what comes next.

  1. 1

    Initial Conversation

    We learn about your project, priorities, location and general timeline.

  2. 2

    On-Site Consultation

    We inspect the space, discuss design ideas and identify construction requirements.

  3. 3

    Detailed Proposal

    You receive a written scope explaining the work, allowances and payment schedule.

  4. 4

    Construction

    The project is coordinated through demolition, rough work, installation, inspections and finishes.

  5. 5

    Final Walkthrough

    We review the completed project and address final details before closeout.

Open-plan living room with fireplace after a whole-home renovation

RELATED CASE STUDY

Clearwater Whole-Home Renovation

Clearwater, FL · 14 weeks

A load-bearing wall came out for an open plan, then a new kitchen, two baths, flooring and paint carried through the whole level.

READ THE FULL CASE STUDY

COMMON QUESTIONS

Kitchen Remodeling Questions

How long will we be without a kitchen?

Plan on five to eight weeks of active construction, and assume the room is unusable for most of it. We set up a temporary counter with the fridge and microwave somewhere sensible before demolition starts, and we tell you which week the sink comes back.

Do I have to pick appliances before you start?

Yes, and this is the one that catches people. Rough-in positions for gas, water, drain and duct come from the spec sheet of the actual model. Changing the range after the line is run means opening the wall again.

Can you keep the existing cabinet layout to save money?

Often, and it is a real saving when the plumbing and appliances stay put. What it does not save is cabinet cost, and refacing a layout that never worked buys you the same frustrating kitchen with new doors.

Does the range hood have to vent outside?

It should. A recirculating hood filters grease and puts the heat and moisture straight back in the room. Where the duct run is genuinely impossible we will say so rather than pretend the filter is equivalent.

Do you need a permit for a kitchen remodel?

If plumbing, gas or electrical moves, yes, and we pull it under CBC1269311. A pure cosmetic swap with nothing relocated sometimes does not, and we will tell you which situation you are in before you ask.

When do the counters get measured?

After the cabinets are set and the sink is on site, never from the drawings. Templating early is how you end up with a gap along the back wall on a wall that was never straight.

Still have a question about your project?Call 813-400-0057

NO OBLIGATION · NO PRESSURE

Request a Project Consultation

Tell us about the space and what you want to change. We review the details, then reach out to schedule an on-site walkthrough.

A real project manager reviews every request
Not a call center. Someone who will be on your job.
Written scope before any work starts
Line-item allowances, schedule and payment milestones.
No fixed-price packages
Pricing follows your layout, plumbing and selections.
Licensed and insured · CBC1269311
Permits pulled and inspections coordinated by us.
Prefer to talk it through?813-400-0057

Tell Us About Your Project

The more detail you share, the more useful our first call is.

Have photos? Email them to info@dreamwayconstruction.com after submitting.

Your information is secure and will never be shared.

Call 813-400-0057Request an Estimate