Clearwater Whole-Home Renovation

A load-bearing wall came out for an open plan, then a new kitchen, two baths, flooring and paint carried through the whole level.

LOCATION
Clearwater
SCOPE
Whole-home renovation
DURATION
14 weeks construction
STRUCTURAL
Engineered beam
PERMIT
Pulled under CBC1269311

WHAT CHANGED

Before & After

Kitchen

A closed galley with a wall oven and failing cabinets became one working run with a cooktop, vented hood and quartz counters.

BEFORE
Kitchen before the renovation
AFTER
Kitchen after the renovation

Living Room

Carpet, a beaten front door and low light gave way to wide-plank flooring and a concrete fireplace wall.

BEFORE
Living Room before the renovation
AFTER
Living Room after the renovation

Primary Bathroom

The tub alcove and half-height tile came out for a walk-in shower and a floating vanity.

BEFORE
Primary Bathroom before the renovation
AFTER
Primary Bathroom after the renovation

Guest Bathroom

Shown mid-demolition, stripped back to block and rafters, then rebuilt around the tub.

BEFORE
Guest Bathroom before the renovation
AFTER
Guest Bathroom after the renovation
Open-plan living room with fireplace after a whole-home renovation
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work
Clearwater Whole-Home Renovation, finished work

THE STARTING CONDITION

One Level, One Plan

The house worked as a set of small rooms and nothing else. Removing the wall between the kitchen and living room was the whole point of the project, and everything else followed from it.

We had the beam sized by an engineer before pricing the work, so the structural line in the proposal was a real number rather than an allowance.

Why it mattered

Wall removal is where whole-home budgets move. Knowing the beam, the posts and the foundation loads up front is what kept this one on its written scope.

Fourteen Weeks, Lived-In Since

The owners moved out for the structural phase and back in for finishes. Both bathrooms were flood-tested before tile, same as every wet area we build.

WHAT WE DID

Scope of Work

Load-bearing wall removed and replaced with an engineered beam and new posts.

Kitchen relocated and rebuilt with full-height cabinetry and quartz counters.

Two bathrooms taken to the studs, both with bonded membranes and flood tests.

Flooring carried through the whole level to remove every threshold transition.

Electrical panel and branch circuits updated to current code.

Interior paint, trim and doors replaced throughout.

14 wks
Construction
2
Bathrooms rebuilt to the studs
1
Load-bearing wall removed

NO OBLIGATION · NO PRESSURE

Request a Project Consultation

Tell us about the space and what you want to change. We review the details, then reach out to schedule an on-site walkthrough.

A real project manager reviews every request
Not a call center. Someone who will be on your job.
Written scope before any work starts
Line-item allowances, schedule and payment milestones.
No fixed-price packages
Pricing follows your layout, plumbing and selections.
Licensed and insured · CBC1269311
Permits pulled and inspections coordinated by us.
Prefer to talk it through?813-400-0057

Tell Us About Your Project

The more detail you share, the more useful our first call is.

Have photos? Email them to info@dreamwayconstruction.com after submitting.

Your information is secure and will never be shared.

Call 813-400-0057Request an Estimate