Licensed & Insured·CBC1269311·Serving Tampa Bay
Dreamway Construction logo
REQUEST AN ESTIMATE
Primary bathroom rebuilt as a wet room with a curbless shower and a freestanding tub

St. Petersburg Wet Room and Guest Bath

A corner tub deck and a separate shower stall came out of the primary bath for one open wet room, while the guest bath kept its footprint and got everything else.

LOCATION
St. Petersburg
SCOPE
Two bathrooms
PRIMARY
Curbless wet room
GUEST
Tub surround

WHAT CHANGED

Before & After

Primary Bathroom

The corner tub deck and the separate shower stall came out. What replaced them is one open wet room.

BEFORE
Primary Bathroom before the renovation
AFTER
Primary Bathroom after the renovation

Guest Bathroom

The half-height beige tile and the cabinet over the toilet came out. The tub surround now runs floor to ceiling.

BEFORE
Guest Bathroom before the renovation
AFTER
Guest Bathroom after the renovation
Primary bathroom rebuilt as a wet room with a curbless shower and a freestanding tub

THE STARTING CONDITION

Two Fixtures Were Eating the Room

The primary bath had a corner tub sitting on a tiled deck and a separate glass shower stall. Between them they took most of the floor and left a bathroom that felt smaller than its measurements.

Both came out. What replaced them is a wet room: a curbless shower and a freestanding tub sharing one waterproofed floor behind a single glass panel. The tub is still there. It simply stopped occupying a deck of its own.

The Guest Bath Kept Its Plan

Nothing was wrong with the guest bathroom’s layout, so it did not move. The half-height beige tile came off, the surround was retiled floor to ceiling in stacked gloss tile, and the cabinet hanging over the toilet came out. A slatted wood vanity, a round mirror and a pair of sconces took the corner sink’s place.

Both rooms were built as part of a wider job. The kitchen, the flooring and the exterior are covered in the full whole-home renovation.

WHAT WE DID

Scope of Work

Primary bath corner tub deck and separate shower stall demolished.

Primary bath rebuilt as a wet room, curbless shower and freestanding tub behind one glass panel.

Large-format porcelain to the walls, with fluted wood-look tile behind the shower.

Double vanity with a full-width mirror and fluted wall panelling.

Guest bath tub surround retiled floor to ceiling in stacked gloss tile, with a new valve and trim.

New guest bath vanity, round mirror, sconce lighting, toilet and flooring.

Cabinet over the guest toilet removed to open the wall.

NO OBLIGATION · NO PRESSURE

Request a Project Consultation

Tell us about the space and what you want to change. We review the details, then reach out to schedule an on-site walkthrough.

A real project manager reviews every request
Not a call center. Someone who will be on your job.
Written scope before any work starts
Line-item allowances, schedule and payment milestones.
No fixed-price packages
Pricing follows your layout, plumbing and selections.
Licensed and insured · CBC1269311
Permits pulled and inspections coordinated by us.
Prefer to talk it through?813-400-0057

Tell Us About Your Project

The more detail you share, the more useful our first call is.

Have photos? Email them to info@dreamwayconstruction.com after submitting.

Your information is secure and will never be shared.

Call 813-400-0057Request an Estimate