Licensed & Insured·CBC1269311·Serving Tampa Bay
Dreamway Construction logo
REQUEST AN ESTIMATE
Rebuilt primary bathroom with a walk-in shower and a floating vanity

Clearwater Two-Bathroom Rebuild

Both bathrooms in the house were taken to the studs, waterproofed with bonded membranes and flood-tested before a single tile went down.

LOCATION
Clearwater
SCOPE
Two bathrooms
WATERPROOFING
Bonded membrane
PERMIT
Pulled under CBC1269311

WHAT CHANGED

Before & After

Primary Bathroom

The tub alcove and half-height tile came out for a walk-in shower and a floating vanity.

BEFORE
Primary Bathroom before the renovation
AFTER
Primary Bathroom after the renovation

Guest Bathroom

Shown mid-demolition, stripped back to block and rafters, then rebuilt around the tub.

BEFORE
Guest Bathroom before the renovation
AFTER
Guest Bathroom after the renovation
Rebuilt primary bathroom with a walk-in shower and a floating vanity

THE STARTING CONDITION

Two Rooms, Same Standard

Nobody photographs waterproofing, which is why the guest bathroom here is shown mid-demolition, stripped back to block and rafters. That is the state a bathroom has to reach before anyone can honestly say what is behind the tile.

Both rooms got the same treatment: bonded sheet membrane over the full wet area, corners banded, and a flood test before tile. The finishes differ because the rooms do different jobs. The waterproofing does not differ.

Where They Diverged

The primary lost its tub alcove entirely and became a walk-in shower with a floating vanity. The guest bath kept its tub, because a house with two bathrooms and no tub is a house that is harder to sell.

Both were built as part of a wider job. The structural work, the kitchen and the flooring are covered in the full whole-home renovation.

WHAT WE DID

Scope of Work

Primary and guest bathrooms both demolished back to studs and block.

Bonded waterproofing membrane over every wet area, corners banded and sealed.

Both wet areas flood-tested before tile.

Primary tub alcove and half-height tile removed for a walk-in shower.

Floating vanity and new lighting in the primary bath.

Guest bath rebuilt around the tub, retiled floor to ceiling.

New guest vanity, mirror and fixtures.

NO OBLIGATION · NO PRESSURE

Request a Project Consultation

Tell us about the space and what you want to change. We review the details, then reach out to schedule an on-site walkthrough.

A real project manager reviews every request
Not a call center. Someone who will be on your job.
Written scope before any work starts
Line-item allowances, schedule and payment milestones.
No fixed-price packages
Pricing follows your layout, plumbing and selections.
Licensed and insured · CBC1269311
Permits pulled and inspections coordinated by us.
Prefer to talk it through?813-400-0057

Tell Us About Your Project

The more detail you share, the more useful our first call is.

Have photos? Email them to info@dreamwayconstruction.com after submitting.

Your information is secure and will never be shared.

Call 813-400-0057Request an Estimate