Licensed & Insured·CBC1269311·Serving Tampa Bay
Dreamway Construction logo
REQUEST AN ESTIMATE
Wet room in sea-green tile with twin rain heads, a bench and a copper soaking tub

South Tampa Wet Room with Copper Tub

A garden tub on a tiled deck and a separate shower stall came out for one glass-walled wet room, with a copper soaking tub under the window and a bench running its full length.

LOCATION
South Tampa
SCOPE
Primary bathroom
WET AREA
Tub and shower behind one glass wall
TILE
Sea-green gloss

WHAT CHANGED

Before & After

Primary Bathroom

A corner garden tub and a separate stall each took a piece of the room. Both went, and what replaced them is one wet area holding the shower and the tub together.

BEFORE
Primary Bathroom before the renovation
AFTER
Primary Bathroom after the renovation

IN THE DETAIL

Closer In

The tub is inside the wet area

The tub is inside the wet area

Putting the copper tub behind the glass rather than out in the room means the whole floor is waterproofed and drained as one, so overspray from either shower head is a non-event. It also means the tub filler and the window sill sit in a tiled wall instead of a painted one.

THE STARTING CONDITION

Two Fixtures, One Room, One Floor

The starting bathroom gave a corner to a garden tub nobody filled and a second corner to a shower stall barely wide enough to turn around in. Between them they used most of the floor and neither was good.

Taking both out and treating the far half of the room as a single wet area is what buys the space back. The shower and the tub now share one waterproofed floor, one drain line and one glass wall.

Tile That Runs Everywhere

Stacked vertical tile floor to ceiling on every surface, including the bench and the return walls, is what makes a wet room read as one room rather than a shower with a tub in it.

It also means there is no transition detail to get wrong: no tile-to-paint line at shoulder height, no trim above the old surround, nothing that will move when the room gets used the way a wet room gets used.

WHAT WE DID

Scope of Work

Garden tub, tiled deck and the separate shower stall all demolished.

Whole wet area waterproofed and flood-tested before tile.

Floor built out to a curbless entry with a linear drain across the opening.

Sea-green gloss tile stacked vertically, floor to ceiling on every wall.

Full-length tiled bench built into the run.

Twin rain heads and a shared hand shower on the back wall.

Copper soaking tub set inside the wet area, under the existing window.

Frameless glass to the ceiling with a pair of doors, and a grab bar in polished chrome.

Large-format porcelain floor tile through the wet area and the room.

NO OBLIGATION · NO PRESSURE

Request a Project Consultation

Tell us about the space and what you want to change. We review the details, then reach out to schedule an on-site walkthrough.

A real project manager reviews every request
Not a call center. Someone who will be on your job.
Written scope before any work starts
Line-item allowances, schedule and payment milestones.
No fixed-price packages
Pricing follows your layout, plumbing and selections.
Licensed and insured · CBC1269311
Permits pulled and inspections coordinated by us.
Prefer to talk it through?813-400-0057

Tell Us About Your Project

The more detail you share, the more useful our first call is.

Have photos? Email them to info@dreamwayconstruction.com after submitting.

Your information is secure and will never be shared.

Call 813-400-0057Request an Estimate